Wind Energy

AVERTEX is committed to assisting our customers in the construction of the most innovative, reliable, and cost effective underground collector systems and/or transmission line systems backed by an insurable, bondable, and well-respected organization for both small and large wind projects.

More than 1.4 million metres of conductor cable on 735 megawatts of wind energy projects has been installed using a combination of trenchless plowing (3 phase & sand encased), speed trenching, rock sawing and horizontal directional drilling (HDD) technology. Our experience together with our wide range of specialized equipment can easily be adapted to meet the needs of our underground electrical customers.

Our construction service experience includes installations of:

  • Cable
  • Cable splices and terminations
  • Transformers, switchgears, junction boxes and vaults
  • Fibre optic cable and splices
  • Wind turbine grounding
  • Turnkey underground collector system

Our methods of installation include:

  • Plowing—3 phase, sand encased
  • Speed Trenching
  • Rock sawing
  • Horizontal directional drilling

Learn more about an AVERTEX solution for your project:



© Copyright 2007 Avertex Utility Solutions Inc. Site design by Compass Creative Studio Inc.