Projects: Telecommunications

Eglinton Ave Manhole Rebuild

Crosstown Transit Constructors

Breaking out and relocating Bell Canada concrete encased duct structures and manholes at 6 tunneling shaft locations.  Work included rebuilding manholes with steel framing and hanging upwards of 9 metre long manholes from the road decking beams beneath live traffic. Also included rebuilding an “L” shaped manhole packed with live backbone cables.