Greenbank

Bell Canada

In order to allow the grade separation a bridge over Greenbank Rd had to be constructed. The CN and Bell360 FOC had to be exposed and relocated in split steel protection to the south to accommodate the building of the bridge‎. Once the bridge was complete, brackets and 6" steel trough was installed onto the new bridge. The split steel that was relocated south was then exposed, removed and the cables were placed into the trough. CN on the south side and Bell360 on the north side.