Projects: Renewable Energy

Grand Renewable Energy Park 150MW

Samsung C&T Canada Ltd.

Install 167km underground collection system via plow and trench with approx. 22km directional drilled.  Of that work 3km was constructed in bedrock with a rock trencher and 3.4km had to be directional drilled in bedrock.  Work included the splicing, terminating and testing of medium and low voltage cables and fibre optic cables.