Install 225km of underground collector system via plow and trench with approx. 50km of that being directional boring.  A small amount had to be completed through bedrock via drilling and trenching.  Work also included the splicing, terminating, testing, low voltage from padmount transformer (PMT) to wind turbine generator (WTG) and fibre optic work.