Projects: Renewable Energy

Melancthon Wind Project 198MW

Canadian Hydro

Through two phases a) 67.5MW, 35km collector system and b) 132MW, 200km collection system, this project was constructed.  Work included installation via plow, trench, and directional boring and was inclusive of the splicing and terminating of medium voltage cables.