Projects: Specialty Services

Hwy 6 Crossing Pipe Ram

Guelph Hydro

Construction of a 100m 16x100mm duct bank through a 60m long 762mm steel casing installed via pipe ramming under the Hanlon Pkwy.  The conduits were subsequently grouted in place with spacers inside the casing, the remainder of the concrete encased duct bank was installed by open trench.