Projects: Telecommunications

Franklin Dr Rehab

Bell Canada

Installation of 3,600m of duct bank which varied from 4PVCD1 to 30PVCD1 ducts concrete encased.  Construction of 3 new cast-in-place concrete manholes, breakout and replace 1 existing manhole handling 14 cables, and bore a 450mm steel casing under the railway with 9x89mm ducts inside the casing.